Inverter and Battery Installation

Works - Gaya

Inverter and Battery Installation

Inverter mounted, backup circuit separated, battery wired with the right cable and a proper earth.

₹999

per visit
At Home

Choose a date

Verified professional
Pay after service
Reschedule anytime
Satisfaction assured

The Shuunnya promise

The backup circuit is separated properly so the inverter is never asked to carry what it cannot.

  • Measured and quoted before we start, including any new backup wiring.
  • Our own trained electrician, background checked, never a subcontracted hand.
  • 12 month workmanship guarantee with a free revisit.
  • Cables crimped and lugged to size, not twisted and taped.
  • Packaging removed, the corner swept and the trolley left level.

Quality & reports

Shuunnya Verified

Independent quality and lab reports for this product — download to verify.

Details

An inverter is only as good as the circuit behind it. We separate a dedicated backup line so that fans, lights and one or two sockets run on the inverter while heavy loads stay on the mains, mount the unit where it can breathe, and wire the battery with cable that is sized for the current instead of whatever came in the box. Rs. 999 covers a standard single battery installation with an existing backup line. A new backup circuit is measured and quoted at the door before we start. We also service and re-commission an inverter that has stopped charging, so a set-up we do is a set-up we come back to.

  • Backup circuit separated so heavy loads cannot reach the inverter
  • Battery cable sized to the current, lugged and crimped, not twisted
  • Ventilated placement with clearance, terminal tray and trolley levelled
  • Full charge and cut-over test on load before we leave
  • 12 month guarantee on the installation workmanship

Product information

What is included
Placement
Wall or trolley mounting with ventilation clearance and a level battery tray
Wiring
Crimped and lugged battery leads sized to the current, polarity double checked
Backup circuit
Connection to an existing separated backup line, with an MCB on the inverter output
Testing
Charging current verified, cut-over tested under real load, water level checked
Handover
You are shown how to read the indicators and top up distilled water
What is not included
Inverter and battery
Bring your own, or we quote and supply
New backup wiring
Separating a backup circuit where none exists is quoted after measurement
Distilled water
First top up is free, refills are not included
Solar
Panel and charge controller work is a separate scope
How long it takes
Standard setup
90 to 120 minutes
With a new backup circuit
Half to one working day
First full charge
8 to 10 hours, unattended, after we leave
Warranty
Workmanship
12 months on the installation, terminations and mounting
Revisit
Free if the cut-over or charging fails due to our wiring
Product
Inverter and battery carry the manufacturer warranty, bills handed over

Ratings & reviews

Loading reviews...